The assembly is made up of 5 parts:
The rubber seal is placed between the acrylic and the lip on the body. The body is inserted through the hole and the lock nut is hand tightened. The lock nut is now tightened ½ to 1 turn to seal the rubber gasket . Then 100% clear silicone is applied to seal the nut, body and back of shell and offer a second water seal.
The 3 fountains cascade out and all three should be landing about the same distance from the jet nozzle.
If one or more of the water fountains is not matching the others in distance, the internal nozzle screen may need to be cleaned.
To clean the nozzle remove the black cap by turning it ¼ counter clockwise. Using small needle nose pliers, pull the nozzle straight out.
The Fountains are typically controlled by the ON/OFF valve. The water is typically supplied from “Pump 1”
Copyright © 2024 Canadian Hot Tub Retailers - All Rights Reserved.
Powered by GoDaddy Website Builder